Our Work
M&E Case Studies
How we successfully help our M&E clients
Trusted by major clients across Cheshire, Manchester and the Northwest region. Read or download our Mechanical & Electrical and specialist services case studies. Meel Group M&E contractors - working with healthcare, education, architects, builders and the public sector.
Case Study: Oldham Sixth Form College Boiler house refurbishment
College Boiler house refurbishment with green energy integration.
Case Study: M&E Refurbishment East Manchester Academy
M&E Refurbishment East Manchester Academy
Case Study: Orthotics and Dental Lab Refurbishment
M&E refurbishment of Orthotics and Dental Lab at Stepping Hill
Case Study: NHS Data Cabinet Refresh Wireless Programme
NHS Data Cabinet Refresh & Wireless Programme
Case Study: Lighting installation and electrical maintenance ICU & HDU facilities
Sensory Lighting, Bedhead Lighting and Electrical Maintenance
Case Study: Pupil Relocation Unit moves to new site
Pupil Relocation Unit moves to new site.
Case Study: Wedding Venue Development- Mechanical & Electrical
Mechanical and Electrical installation as wedding venue expands.
Case Study: Chadderton Medical Practice Boiler Room Refurbishment
Refurbishment improves the reliability and efficiency of the heating system at Chadderton Medical Practice.
Case Study: St Francis RC Primary School Mechanical & Electrical Installation
School HVAC, Domestic Services, WCs & Electrical Works refurbished
Case Study: Primark Store Conversion- Mechanical & Electrical
M&E preparation at the Broadway Shopping Centre, Bradford.
Case Study: Automated internal doors – Stepping Hill Hospital
Automated internal doors - Stepping Hill Hospital. Improving security and efficiency.
Case Study: Heating System Refurbishment – Waters Meeting Health Centre
Heating System Refurbishment - Bolton NHS Healthcare.
Case Study: New Plant Room and Heating Refurbishment – Nevill Road Junior School
Stockport Junior School has an efficient heating and hot water system installed by Meel Group
Case Study: Healthy Hyde Body and Mind Centre Clarendon Square Shopping Mall
Healthy Hyde Body and Mind Centre Clarendon Square Shopping Mall
Case Study: Heating System Refurbishment – Levenshulme High School
Including the removal of the redundant system and the installation of a new energy-efficient system and controls.
Case Study: Heating System Refurbishment – West Lakes Academy
Heating System Refurbishment - West Lakes Academy
Case Study: Refurbishing A1 Ward Annexe into Modern Office Space
Remodelling and Combined M&E Refurbishment of a ward annexe into Modern Office Space. Stepping Hill - Stockport NHS Trust
Case Study: Boiler Room Refurbishment – NHS Pathology Lab
Boiler Room Refurbishment - Stockport NHS Trust Pathology Lab
Case Study: Electrical Installation at NHS Health Hub – Shopping City Runcorn
Electrical contracting - Halton Borough Council and Warrington and Halton Teaching Hospitals created a new Health Hub at Runcorn Shopping City.
Case Study: Electric Fleet Charging for NHS Trusts
EV Fleet - Stockport NHS Trust is committed to achieving a carbon-neutral status by 2040.
Case Study: Complete M&E Provision Sandon Global New UK Headquarters
Case Study: Complete M&E Provision Sandon Global New UK Headquarters
Case Study: Anti-Ligature Room Refurbishment – Stockport NHS
Stepping Hill Hospital's The Anti-ligature room within the Children’s Unit required a complete refit.
Case Study: NHS Operating Theatre Refits
Stepping Hill Hospital's operation theatres required extensive modernisation as the existing equipment was outdated.
Case Study: Electrical refurbishment – Leigh Town Hall
Leigh Town Hall refurbishment - electrical installation contractor - state of the art low energy lighting for public buildings. Meel Group covers the whole Northwest region.
Case Study: Emergency Lighting Stepping Hill Hospital
Stepping Hill Hospital's emergency (fully compliant) lighting installation - for Warden Construction
Case Study: Complete Electrical Re-wire, Heating and Ventilation Refurbishment – Sutton Academy – St. Helens
Complete Electrical rewire and Mechanical Heating and Ventilation Refurbishment - Sutton Academy - St. Helens
Case Study: Installation of New Sub Main – Tytherington School
An extension to the school needed a new electrical supply; the project required us to fit a new sub-main and section board.
Case Study: Endoscopy Unit – Stepping Hill Hospital
Refurbishing the existing facility and increasing the department's size with a brand-new extension.
Case Study: Energy & Efficiency Refurbishment – Bradshaw Hall Primary School
School energy use reduction. Bradshaw Hall Primary School in Cheadle Hulme in the Borough of Stockport. The project duration was from April to October 2022.
Case Study: Heating Refurbishment Higher Lane Primary School
Higher Lane Primary School required a complete heating refurbishment involving new pipework.
Case Study: School Energy Efficiency & Renewables Installation
A Stockport school reduced its carbon footprint by having solar thermal panels installed.
Case Study: Unisex WC installation – Willow Tree Primary School
The project was the creation of a unisex WC facility to be achieved by upgrading the separate boys/girls WCs.
Case Study: Mechanical & Electrical Installation – Hexstone Ltd – Staffordshire
M&E Contractors install new staff facilities changing rooms, and a kitchen for Hexstone Ltd in Staffordshire
Case Study: Great Moor Primary School – Full Rewire
Great Moor Primary now have an improved facility with new ceilings and LED lighting installed throughout.