Case Study: Electrical refurbishment – Leigh Town Hall

Case Study: Electrical

Client: Carefoot PLC

Sector: Public sector

Completed: March 2021

Budget: £75,000

Location: Leigh – Greater Manchester

Summary: Electrical Refurbishment

Public Building Electrical Refurbishment.

Site

Grade II listed Leigh Town Hall in the Greater Manchester Borough of Wigan was built in 1904. In 2019 it underwent a £1.3m refurbishment to convert it to a modern, state-of-the-art archive and learning space for the people of Wigan.

Contract Arrangements & Scope of works.

As domestic sub-contractors to Carefoot PLC, we stripped out and removed the existing electrics in the Town Hall and installed complete and comprehensive electrical services and systems as per NPS/Wigan Council’s specification.

Our contract was awarded by competitive tender and instructed after interview. We have worked with Carefoot PLC for more than 20 years on many successful schemes in the North West.

Leigh Town hall LED contractor
Leigh Town hall stair lighting LED contractor

Project challenges

We were fully prepared for the challenges that would inevitably arise from working with a grade II listed building. These included complicated installations and wire ways and the need to coordinate closely with many other trades on site.

 

Midway through the contract, we faced the prospect of working under the restrictions brought about by the national lockdown. As a result, we devised flexible COVID-secure ways of working, enabling us to continue working effectively in what became an ever-changing and highly challenging working environment.

Leigh Town hall LED- energy saving lighting installer
Leigh Town hall electrical refurbishment contractor

We delivered a successful installation that brought this stunning building back to life. Work was completed in line with the programme brief, while close liaison with designers and architects enabled us to ensure every detail met the client’s expectations. Similarly, by working closely with the lighting designers and other trades on-site, we were able to efficiently co-ordinate project schedules.