Hospital Emergency Lighting Installation – Stepping Hill Hospital
Stepping Hill Hospital's emergency (fully compliant) lighting installation - for Warden Construction
Case Study: Complete Electrical Re-wire, Heating and Ventilation Refurbishment – Sutton Academy – St. Helens
Complete Electrical rewire and Mechanical Heating and Ventilation Refurbishment - Sutton Academy - St. Helens
Case Study: Installation of New Sub Main – Tytherington School
An extension to the school needed a new electrical supply; the project required us to fit a new sub-main and section board.
Case Study: Endoscopy Unit – Stepping Hill Hospital
Refurbishing the existing facility and increasing the department's size with a brand-new extension.
Case Study: Energy & Efficiency Refurbishment – Bradshaw Hall Primary School
School energy use reduction. Bradshaw Hall Primary School in Cheadle Hulme in the Borough of Stockport. The project duration was from April to October 2022.
Case Study: Heating Refurbishment Higher Lane Primary School
Higher Lane Primary School required a complete heating refurbishment involving new pipework.
Case Study: School Energy Efficiency & Renewables Installation
A Stockport school reduced its carbon footprint by having solar thermal panels installed.
Case Study: Unisex WC installation – Willow Tree Primary School
The project was the creation of a unisex WC facility to be achieved by upgrading the separate boys/girls WCs.
Case Study: Mechanical & Electrical Installation – Hexstone Ltd – Staffordshire
M&E Contractors install new staff facilities changing rooms, and a kitchen for Hexstone Ltd in Staffordshire
Case Study: Great Moor Primary School – Full Rewire
Great Moor Primary now have an improved facility with new ceilings and LED lighting installed throughout.