Case Study: St Georges Primary School Heating & Lighting Refurbishment
The existing electrical, heating distribution and boiler room had reached the end of their serviceable lives.
Medical Centre Plant Room Refurbishment – Birtle View Medical Practice
Medical Centre boiler house with Air Source heat pump integration
College Boiler House & Heating System Refurbishment – Oldham Sixth Form College
College Boiler house refurbishment with green energy integration at Oldham Sixth Form College
Case Study: Chadderton Medical Practice Boiler Room Refurbishment
Refurbishment improves the reliability and efficiency of the heating system at Chadderton Medical Practice.
Case Study: Heating System Refurbishment – Waters Meeting Health Centre
Heating System Refurbishment - Bolton NHS Healthcare.
Case Study: New Plant Room and Heating Refurbishment – Nevill Road Junior School
Stockport Junior School has an efficient heating and hot water system installed by Meel Group
Case Study: Heating System Refurbishment – Levenshulme High School
Including the removal of the redundant system and the installation of a new energy-efficient system and controls.
Case Study: Heating System Refurbishment – West Lakes Academy
Heating System Refurbishment - West Lakes Academy
Case Study: Boiler Room Refurbishment – NHS Pathology Lab
Boiler Room Refurbishment - Stockport NHS Trust Pathology Lab
Case Study: Energy & Efficiency Refurbishment – Bradshaw Hall Primary School
School energy use reduction. Bradshaw Hall Primary School in Cheadle Hulme in the Borough of Stockport. The project duration was from April to October 2022.








