Case Study: Loreto Sixth Form College
Complete mechanical and electrical installation for the college's new buildings.
Case Study: St Georges Primary School Heating & Lighting Refurbishment
The existing electrical, heating distribution and boiler room had reached the end of their serviceable lives.
Case Study: Whiteways Primary School – School Lighting Replacement
Our electrical installation team install new energy efficient lighting system within a Sheffield school
Case Study: Alexandra Park School Electrical Upgrade
The existing electrical infrastructure had reached the end of its serviceable life.
Case Study: Oldham Sixth Form College Boiler house refurbishment
College Boiler house refurbishment with green energy integration.
Case Study: M&E Refurbishment East Manchester Academy
M&E Refurbishment East Manchester Academy
Case Study: Pupil Relocation Unit moves to new site
Pupil Relocation Unit moves to new site.
Case Study: St Francis RC Primary School Mechanical & Electrical Installation
School HVAC, Domestic Services, WCs & Electrical Works refurbished
Case Study: New Plant Room and Heating Refurbishment – Nevill Road Junior School
Stockport Junior School has an efficient heating and hot water system installed by Meel Group
Case Study: Heating System Refurbishment – Levenshulme High School
Including the removal of the redundant system and the installation of a new energy-efficient system and controls.








