Case Study: Loreto Sixth Form College
Complete mechanical and electrical installation for the college's new buildings.
Case Study: St Georges Primary School Heating & Lighting Refurbishment
The existing electrical, heating distribution and boiler room had reached the end of their serviceable lives.
Case Study: Whiteways Primary School – School Lighting Replacement
Our electrical installation team install new energy efficient lighting system within a Sheffield school
Case Study: Churchtown Medical Centre
Churchtown Medical Centre moves forward with NHS decarbonisation strategy.
Case Study: Alexandra Park School Electrical Upgrade
The existing electrical infrastructure had reached the end of its serviceable life.
Case Study: Birtle View Medical Practice – plant room refurbishment
Medical Centre boiler house with Air Source heat pump integration
Case Study: Oldham Sixth Form College Boiler house refurbishment
College Boiler house refurbishment with green energy integration.
Case Study: M&E Refurbishment East Manchester Academy
M&E Refurbishment East Manchester Academy
Case Study: Orthotics and Dental Lab Refurbishment
M&E refurbishment of Orthotics and Dental Lab at Stepping Hill
Case Study: NHS Data Cabinet Refresh Wireless Programme
NHS Data Cabinet Refresh & Wireless Programme








