Case Study: Healthcare
Client: Stockport NHS Foundation Trust
Date: February – March 2026
Primary Services Used
- Project Manager
- Electrical Engineering
- Nurse Call Specialists
- Testing & Commissioning Engineers
- Health & Safety Management
- Client Liaison
Installation of a comprehensive nurse call system within Radiology B, at Stepping Hill Hospital.
Project Background:
Radiology Block B had an unreliable, non-HTM-compliant system that had reached the end of its life. It required total replacement with a modern state-of-the-art Nurse Call system. Meel Group Projects were enlisted as the principal contractor to carry out the work involved under the SBS framework.
Overview:
The project involved removing the old system and installing a new and comprehensive nurse call infrastructure across the entire department, including patient call points, staff assistance alarms, emergency WC alarms, over-door indicators, central display panels, cabling infrastructure, and UPS-backed equipment.
System Outline:
The system consists of both patient and staff assistance alarms.
Patient calls generate visual and audible alerts. Staff assistance calls typically operate at a higher priority level. Emergency WC alarms utilise accessible pull-cord units. Over-door lights provide a visual indication of alarm locations. Calls are displayed at nurse station panels and repeater displays where installed.
Our installation of the nurse call systems is hard-wired for maximum reliability. And the system is reset locally at the originating call point after assistance has been provided.
- Patient call alarms
- Staff assistance alarms
- Emergency WC pull-cord alarms
- Treatment room assistance alarms
- Over-door indicators
- Central nurse station displays
- UPS-backed control equipment
UPS Backup
The system design for Health Technical Memoranda (HTM) compliance. In the event of a power outage to the system, the Uninterrupted Power Supply (UPS) typically supports critical nurse call infrastructure for 30 minutes.
Project Challenges:
At Meel Group, our Project managers and teams are used to working within live clinical environments.
During our planning and execution of hospital projects, we always work very closely with the Trust and the department managers. This allows us to maintain service continuity, implement the infection control requirements and minimise disruption to patient care.






Health and safety”
Health and safety are paramount at Meel Group, and within this work environment, the following elements formed the core of our installation.
- Permit-to-work controls
- Infection prevention measures
- Electrical isolation procedures
- Dust management
- Safe access arrangements
- Patient safeguarding requirements
The installation activities above took place in clinical areas and were controlled through exclusion zones, managed access, safe working platforms and close coordination with ward staff.
Project Result:
The Trust was pleased with the completed installations, which improved reliability, patient safety and staff response capability while minimising disruption to ongoing healthcare operations.
Patients and Staff within Radiology B at Stepping Hill Hospital now have all the security provided by the installation of a modern, robust nurse call system.